PHASE 2 PROJECT PHOTOS – CONSTRUCTION PHOTOS

2nd floor electrical roughing Facing East.jpg 3rd floor interior metal framing Facing North-West.jpg Block work at the 2nd floor UCIA Facing East.jpg Installed ductwork fitings at the 3rd floor Facing West.jpg Installed motorized dampers at the 2nd floor Facing West.jpg Installed roof curbs at the high roof Facing East.jpg
Previous pageNext page 3rd floor interior metal framing Facing North-West
3rd floor interior metal framing Facing North-West